CI perf: ci-ok — 2-second check waits up to 2.6 min for a Depot host to boot, serially at the end of every run (~0.5–2.6 min per merge) #1745

Closed

Description

Filed by the CI profiler routine.

Measurement

Window: 2026-10-27 13:07 → 20:16 UTC. Sample: every ci-ok job in the window's CI runs that I fetched jobs for (n=21: 9 merge_group, 9 push, 3 pull_request; filter=all).

ci-ok runs one step, Check every needed job, which takes 0–2 s. Its job time is almost all Depot start-up: the gap from the job's started_at to its first step.

slice ci-ok start gap (s)
13:07–15:02 (n=15) 6, 5, 5, 29, 6, 5, 5, 28, 19, 33, 6, 31, 37, 4, 5
16:17–20:16 (n=6) 155, 131, 6, 30, 123, 5

Examples:

For comparison, GitHub-hosted ubuntu-latest jobs in the same hour (the Audit GHA Workflows, Merge queue janitor and Merge queue fail-fast runs at 19:48–20:12) were queued 2 s and started their first step 0–1 s after starting (n=3).

The slow starts aren't specific to ci-ok. Across all 172 Depot jobs in the 8 CI runs since 16:17, 64% (110) had a start gap over 15 s: p50 31 s, p90 91 s, max 179 s. That is up from 16% in the 13:07–14:58 burst. That host-level problem is #1512 and needs Depot. ci-ok is the one place where a slow start always lands on the critical path, because it runs alone after every other job, and it's the one place where it can be removed in the repo.

Where the time goes

In the 21 ci-ok jobs: start gap mean 32 s, p90 131 s, max 155 s. The check itself takes 0–2 s. Since 16:17 the mean gap is 75 s (n=6).

Root cause

ci-ok runs on depot-ubuntu-24.04-4 (ci.yml:2884), like the other Linux jobs, so it pays a Depot boot. It needs no cache, toolchain or CPU: one python3 call over toJSON(needs).

Proposed fix

In .github/workflows/ci.yml, job ci-ok, change

runs-on: ${{ vars.DISABLE_DEPOT_RUNNERS == 'true' && 'ubuntu-latest' || 'depot-ubuntu-24.04-4' }}

to runs-on: ubuntu-24.04 (GitHub-hosted, which has python3). Keep name: ci-ok, if: always(), needs and timeout-minutes: 5 as they are.

History: #1372 (10-10) moved ci-ok off ubuntu-latest because the hosted Linux pool was backlogged 9–18 min. That was before #1362 moved the Linux CI jobs to Depot. Today only the light audit/janitor/fail-fast jobs use hosted Linux, and they start in 2 s. Before merging, the PR should still check hosted Linux queue wait over the last few days of those workflows' runs. If it's under 10 s at p90, go ahead.

Expected saving

  • Merge-queue critical path: ~0.5 min mean per merge (32 s gap → ~3 s), 2.0–2.5 min on each run during a slow-start episode like the one since 16:17 (3 of 6 runs).
  • PR feedback (created → ci-ok): the same ~0.5 min mean, 2+ min in the tail.
  • Job-minutes: about 0.5 Depot job-min per run, ~50–100 runs/day ≈ 25–50 Linux job-min/day. Moving them to hosted is free for a public repo.

Coverage and risk

No test moves. ci-ok keeps its name and logic, so the required check stays the same. Risk: a hosted Linux backlog like #1372's would put the wait back. That's why the PR should check queue wait first. If hosted ever backs up, revert the one line.

Effort

S. One line.

ROI

(0.05k job-min → 0.05, + 0.5 critical-path min + 0.5 PR-latency min) × confidence 0.7 ÷ effort 1 ≈ 0.7 (≈ 3.5 during slow-start episodes, when it saves 2.5 + 2.5 min).

Activity

  1. mikolalysenko commented on Oct 27, 2026

    @mikolalysenko
    CollaboratorAuthor

    [agent] Triaged as priority:p3 (CI-only). Confirmed on main 4654b7c: ci-ok still runs on depot-ubuntu-24.04-4 (.github/workflows/ci.yml:2884). No open or merged PR moves it. It doesn't duplicate #1512: #1512 is about Depot host boot time in general, and this is the one in-repo change that takes that boot off the critical path. The fix is one line, but the issue asks for hosted Linux queue wait to be checked before merging (because #1372 moved ci-ok off ubuntu-latest), so whoever lands it needs to read Actions run history first.


    Generated by Claude Code

  2. mikolalysenko commented on Oct 27, 2026

    @mikolalysenko
    CollaboratorAuthor

    Working on this in the CI perf implementer.


    Generated by Claude Code

  3. mikolalysenko commented on Oct 27, 2026

    @mikolalysenko
    CollaboratorAuthor

    CI perf implementer (2026-10-27 21:3x UTC): one more data point for this issue. It's about the dashboard's note that Merge queue fail-fast "succeeded" on #1648's first group without evicting it.

    Fail-fast did work. In CI run 40572480618, coverage (1) failed at 19:54:17. The fail-fast watch job (run) finished at 19:54:47, one 30 s poll later. The run's other jobs show cancelled from 19:54:49 to 19:55:39. After that, the only thing left was ci-ok waiting for its Depot host, and it reported at 19:57:54. So the ~3 min between the cancel and the eviction was the ci-ok boot that this issue covers, and #1747 removes it. There's nothing to change in merge-queue-fail-fast.


    Generated by Claude Code

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions