Skip to content

Apply Rhode Island LIHEAP provider exclusions and FY2027 enhancement - #11053

Draft
hua7450 wants to merge 8 commits into
PolicyEngine:mainfrom
hua7450:ri-liheap-utility-providers
Draft

hua7450 wants to merge 8 commits into
PolicyEngine:mainfrom
hua7450:ri-liheap-utility-providers

Conversation

@hua7450

@hua7450 hua7450 commented Nov 16, 2026 •

Copy link
Copy Markdown
Collaborator

Rhode Island adds a utility enhancement to a regular heating grant credited to a gas or electric distribution-company account. R.I. Gen. Laws 39-1-27.12(f) leaves two electric companies out of that definition: "not including the Block Island Power Company or the Pascoag Utility District" (now Block Island Utility District and Clear River Electric and Water District). This PR adds an input for the household's electric company and pays no enhancement when the regular grant goes to one of those two electric accounts. The household keeps its federal grant.

Fixes #11223

Changes

  • ri_liheap_electricity_provider: Rhode Island Energy, Block Island Utility District, Clear River Electric and Water District and UNSPECIFIED (the default). These are the state's three electric distribution companies, so the input has no OTHER choice.
  • ri_liheap_base_payment pays no enhancement when the regular grant reaches a Block Island or Clear River electric account. That covers electric heat and a heat-in-rent grant sent to a separate electric account. A grant on a gas account keeps the enhancement whatever the electric company.
  • UNSPECIFIED is treated as a qualifying account, so a household that reports no company keeps its current result.
  • ri_liheap_base_payment drops its documentation attribute; the same notes are comments in the formula.

The enhancement amounts ($350 for FY2026, $400 for FY2027) are on main already (PR #11141) and do not change here.

Example

One person in income band 1 with electric heat in 2026:

Electric company Federal grant Enhancement Payment
Rhode Island Energy, or not reported $393 $350 $743
Block Island Utility District $393 $0 $393
Clear River Electric and Water District $393 $0 $393

Limitations

  • The model does not know which account receives the federal grant; it keeps its existing route (the primary fuel's account, or a separate electric account for heat in rent).
  • DHS has published no FY2027 base-grant matrix, so 2027 base grants reuse the FY2026 amounts and verified_years stays "2026".

Tests

  • payment/ri_liheap_base_payment.yaml Cases 12-14: each company on the electric-heat route, a gas-account grant with an excluded electric company, the heat-in-rent route with and without an excluded company, and the FY2027 amount on the heat-in-rent route.
  • ri_liheap.yaml Case 18: the final benefit for an electric-heat household on a Clear River account ($393).

The cases were not run locally after these changes; CI runs them.

Sources

axiom: needed

🤖 Generated with Claude Code

@hua7450 hua7450 changed the title Apply Rhode Island LIHEAP utility-provider enhancement exclusions Apply Rhode Island LIHEAP provider exclusions and FY2027 enhancement Nov 17, 2026
hua7450 and others added 2 commits November 20, 2026 15:12
Replace the shared electricity and natural gas provider inputs with
ri_liheap_electricity_provider, an enum in the Rhode Island LIHEAP folder
that lists the state's three electric distribution companies. The
enhancement exclusion for Block Island and Clear River accounts reads it.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
@codecov

codecov Bot commented Nov 20, 2026 •

Copy link
Copy Markdown

Codecov Report

✅ All modified and coverable lines are covered by tests.
✅ Project coverage is 100.00%. Comparing base (8999568) to head (6ccb386).
⚠️ Report is 308 commits behind head on main.

Additional details and impacted files
@@            Coverage Diff            @@
##              main    #11053   +/-   ##
=========================================
  Coverage   100.00%   100.00%           
=========================================
  Files            1         2    +1     
  Lines           24        53   +29     
=========================================
+ Hits            24        53   +29     
Flag Coverage Δ
unittests 100.00% <100.00%> (ø)

Flags with carried forward coverage won't be shown. Click here to find out more.

☔ View full report in Codecov by Harness.
📢 Have feedback on the report? Share it here.

🚀 New features to boost your workflow:
  • ❄️ Test Analytics: Detect flaky tests, report on failures, and find test suite problems.

hua7450 and others added 3 commits November 20, 2026 15:26
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Conflicts: take main's utility_enhancement.yaml and Rhode Island registry
note (PR 11141 already ships the $400 FY2027 enhancement); keep main's
Case 11 and this branch's test cases after it.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
…lusion

- Keep main's utility enhancement values, references and registry note; change
  only the sentence and clause that describe the Block Island and Clear River
  electric exclusion.
- Remove the `documentation` attribute from ri_liheap_base_payment and keep
  its still-true notes as formula comments; simplify the electric-grant route.
- Cite the Division's November 12, 2026 position memo (Docket 26-34-GE) on
  ri_liheap_electricity_provider.
- Tests: number the base-payment cases 12-14, drop a duplicate FY2027 case,
  use Clear River for the gas-heat row and fuel oil on Block Island, and add
  ri_liheap Case 18 for the final benefit on a Clear River account.
- Changelog fragment is now `added`.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Implement Rhode Island LIHEAP enhancement exclusion for Block Island and Clear River electric accounts

1 participant